Skip to main content

Call for tender – Elaboration of Preliminary Flood Risk Management Plan in Debed River Basin (Armenia)

23/02/2026

CLOSING DATE: March 13, 2026

The tender is being launched by the International Office for Water (OiEau), one of the partners of the EU4Green Recovery East (EU4GRE) programme (2025-2028).

The purpose of this assigment is to develop a Preliminary Flood Risk Management Plan for the Debed River Basin in Armenia. The aim is to support the Ministry of Environment of Armenia in aligning national practices with the requirements of Directive 2007/60/EC on the assessment and management of flood risks (EU Floods Directive).

Main tasks include:

  • Conducting a preliminary flood risk assessment for the Debed River Basin;
  • Developing flood hazard maps for a selected pilot area within the basin, including hydrological and hydraulic modelling;
  • Preparing flood risk maps for the same pilot area, incorporating a vulnerability assessment;
  • Drafting a preliminary Flood Risk Management Plan for the Debed River Basin.

Submission Details:

  • Terms of references – Elaboration of Preliminary Flood Risk Management Plan in Debed River Basin of Armenia
  • Interested persons are invited to inquire the full tender dossier by email from
  • Application deadline: March 13th 2026. 

Latest News

Culture Moves Europe: 150 residency projects selected, including in Armenia, Georgia, and Moldova

Armenia: EBRD appoints Remon Zakaria head of Yerevan office

EU4Energy Phase III brings together European and Eastern Partnership energy experts in Brussels

EU Green Week event showcases innovative wastewater solutions for EU’s Eastern Partnership countries

EU Best Practices on wastewater treatment: energy efficiency and sludge valorisation solutions catalogue